At a Glance

£5,900 / annum energy cost savings

91% / annum in energy savings

Background

New luxury domestic build (approx 3,500 sq ft./ 325 sqm) located in East Sussex, United Kingdom.

Challenges

GS Renewable Client, a senior member of Foster and Partners, did not wish to sacrifice internal space for mechanical services. Construction during the pandemic favoured off-site production to comply with COVID-19 restrictions. Integration of multiple technologies required to satisfy heating / cooling and hot water demand.

Solution

Our bespoke heat pump plant room satisfied the client's requirements while increasing living space in their new build. Our GS Renewable bespoke plant room installation has operating cost of

£1800 / annum.

 

Oil usage would have seen our client face operating cost of £6500 / annum.

 

Following the success of our savings with the plant room, our client has requested a PV installation which further decrease the annual running cost by £1200 / annum.

 

A total of £5900 saved on operational cost on a yearly basis upon project completion.

GS Renewable Ireland

Longston Lodge
Kilgowan
Co.Kildare, R56X996
Ireland

GS Renewable GmbH

Mühlenbrücken 3 -5
15517 Fürstenwalde
Germany

GS Renewable UK Ltd

1 Harbour House
Harbour Way
Shoreham-By-Sea, 
West Sussex 
BN43 5HZ
United Kingdom

GS Renewable HK SAR

UNIT D, 6/F., Leapont Centre

18-28, Wo Liu Hang Road

Fo Tan, New Territories

Hong Kong SAR, China

bottom of page